2010 Street Program – ST 956

Scope
The City of Gahanna maintains 136 roadway centerline miles. Crack Seal and Slurry Seal are temporary maintenance applications used to extend the life of asphalt pavements. When the pavement surface has reached the end of its useful life, the asphalt is removed and replaced (also known as “Overlay”, “Resurfacing” or “Paving”). All residential streets will receive a Crack Seal, Slurry Seal and ultimately a Resurfacing.  See our Asphalt Maintenance cycle and the Preventative Maintenance Methodology for further information regarding the City’s guidelines for each application.

Curb Ramps are replaced yearly to meet current ADA Standards. On streets that are resurfaced, all non-compliant ramps will be replaced. Additional ramps will be reconstructed where necessary or by special request.

The 2010 Street program includes work on:
  • Stygler Rd. (Prince of Wales Dr. to Gahanna’s North Corp Limit)
  • Hamilton Rd. (Allanby Ct. to Sycamore Woods Condominiums)
Cost
Engineer’s Estimate: $570,000.00
Bid: $518,027.59 (Chemcote, Inc.)
Final, In-Place Cost: $476,418.54

Status
Project is complete.