What work will be completed on my street?

The major work items planned for your street are as follows: 

Asphalt Overlay:

  • Approximately 3" of deteriorated asphalt will be milled and a new course of asphalt laid in its place.
  • Spot curb and gutter repair will be completed.
  • ADA curb ramps will be replaced when needed.
  • Sidewalk maintenance will be preformed on these overlay streets (50% cost share applied). 

Rebuild:

  • Complete removal and replacement of the roadway and curb.
  • Removal and replacement of your driveway approach.
  • Sidewalks, ADA curb ramps and driveway approaches will be completely rebuilt. 